Technology
Auckland's 150,000 fibre-connected homes suffer slowest broadband speeds nationwide.
The city that led the nation in fibre rollout now records the lowest median download speeds, as tech firms scramble for talent and residents face construction-related outages.
How we reported this

Auckland holds a strange distinction in New Zealand's broadband landscape. As of February 2026, the city recorded the slowest median fixed download speed among major NZ centres at 169.62 Mbps, according to Ookla data cited by Canstar [2]. That sluggish figure comes despite the Ultra-Fast Broadband project completing in Auckland by end-2022, serving more than 469,000 households and businesses, and despite 8,000/8,000 Mbit/s (8 Gbps) services being available to approximately 150,000 premises across the region [1][2].
The gap between what's technically possible and what most residents actually get is frustrating for a city that fancies itself a tech hub. Auckland's tech sector currently has over 1,000 IT job vacancies and 200-plus general tech roles listed on job boards like LinkedIn and Indeed, according to July 2026 figures [1][2]. Entry-level software developers and data analysts can command around $80,000 NZD annually, while senior cloud architects and CIOs pull in $170,000 to $250,000 [2][3]. Yet the connectivity underpinning those high-value roles remains patchy.
Why speeds lag despite fibre glut
Nearly all of Auckland's population is covered by 4G and 5G mobile broadband, with 5G well-covered in central suburbs and along major arterial roads like State Highway 1 [3]. But fixed-line speeds tell a different story. The 169.62 Mbps median download speed, the slowest among big cities, reflects what happens when population density, ongoing construction, and aging infrastructure collide. Residents face recurring internet issues in 2026, with planned upgrades in areas like Mangere and Torbay causing brief wireless interruptions [5].
The 3G mobile broadband network is being retired across New Zealand and is scheduled to be fully completed by mobile providers by April 2026, which could shift more traffic onto 4G and 5G but also leaves some legacy users scrambling for alternatives [4]. For a region where fibre-to-the-home is available to 67 percent of New Zealanders overall, the mismatch between infrastructure investment and real-world performance stings.
Tech hiring frenzy meets connectivity crunch
The city's tech vacancies span roles from Junior IT Support Technicians in East Tamaki, paying $30-$35 per hour, to senior architects earning up to $200,000 annually [1][2]. Programs like the TupuToa Internship and 3Bags Full digital internships aim to bring more Māori, Pacific, and youth into the sector [1]. But the entry-level IT market in Auckland is currently described as tight and saturated, making it tough for recent graduates to land positions [4].
The broader takeaway: Auckland's broadband reality hasn't caught up to its fibre-sales brochure. The UFB project finished on time, but congestion from construction, aging copper in some pockets, and the sheer density of the city mean the raw capacity isn't translating to everyday speeds. For startups relying on cloud-based tools, video calls, and large data transfers, the median 169.62 Mbps is workable but far from the gigabit future the infrastructure promised.
What happens next depends on how quickly Chorus and other providers can decommission the remaining copper network and shift more premises onto the 8 Gbps tier. The capacity exists, roughly 150,000 premises can already order it. The uptake hasn't followed. For now, the city that wired itself first is learning that high-speed internet isn't just about laying fibre. It's about making sure every connection actually delivers.